Complete maintenance works for the offshore platforms and its related parts.
We make complete maintenance for all offshore platform parts even it was pipe or steel structure beams.
Construction works include manufacturing, fabrication, welding and erection works and we are very professional using the marine equipments in erection works and we also make sandblasting and painting works for the platform parts all this works according to the international codes and with respect to all safety rules and instructions

Our company manufacturing and erecting all the platform parts:

  1. manufacturing and erection of boat landing barge bumper with different size include the erection worksfor the rubber fender with several shapes,The works include the lifting of the boat landing to the marine workshop or to the land and making the inspection works to make the maintenance works to the boat landing or replace it
  2. manufacturing and erecting of the net pipes with different diameters in (main deck, heli deck and seller deck)
  3. The system include the product collection pipes, fire fighting system pipes (foam, water) and manifold pipe system
  4. manufacturing and erection of handrail and ladders between platforms levels
  5. manufacturing and erecting of riser clamps on the jacket body
  6. installation and erection works for the grating on all the platforms parts
  7. we make complete maintenance works for the offshore platforms body the works include the sand blasting and painting works for all the platform body

Construction of offshore (gas, oil) pipeline
Our company having a wide experience in offshore pipeline works, we win this experience from working with a lot of company in tens of projects making different offshore pipeline diameters .
We have very big crew which is professional in using the marine equipments to end the offshore works in perfect time with respect offshore safety instructions
We make welding and sending down works by our own equipment and tools and we make the isolation works if required.

We have our special techniques in offshore pipeline works:

  1. prepare working yard to make the onshore works include the civil works of the pipe supports
  2. assempling and welding works with divided pipeline distance in available sections
  3. making all the tests works and inspection works for the welded joints
  4. pulling works with the marine equipments include the diving works

 

Aion Mousa Electricity Station
2011-04-21 To 2011-04-21
Project of construction for offshore pipeline in aion mousa electricity station The works include the special works of sending do   See more
General Petroleum Company
2011-04-21 To 2011-04-21
Project of fabrication, welding and installation for three boat landing and burg bumper. The works include the lifting works to the land, inspectio   See more
General Petroleum Company P02
2011-04-21 To 2011-04-21
Project of making complete maintains works for (GG) platform The works include complete sand blasting and painting for the platform body, replacing the damaged part boat landing, burg   See more
General Petroleum Company P03
2011-04-21 To 2011-04-21
Project of replacing the old manifold 6 inch with the new manifold 8 inch in Elhamd platform. The works include fabrications and welding w   See more
General Petroleum Company P04
2011-04-21 To 2011-04-21
Project of making the new conductor guide for ELHAMED Platform to the three new wells To increasing the production of the platform The works include all the welding, fabrication, erection, sand blasting and painting works   See more
General Petroleum Company P05
2011-04-22 To 2011-04-22
Project of making the new extension for ( GG platform ) platform the extension make to serve the three new wells for the production increase The works include all the fabrication,   See more
Maridive offshore service company
2011-04-22 To 2011-04-22
Manpower supply works to make the offshore maintenance works for petrobel balaem offshore platforms The supplying include all technicians manpower welders, fi   See more
Webco Petroleum Company
2011-04-22 To 2011-04-22
Project of install offshore pipeline to transport the crude oil from the offshore wells to the separation station The works include all the welding, assembli   See more

El-Kholy Contractors and Steel constructions

For Mechanical and Electrical works

Support

Head Office

~ 11, New street , El Sheikh Zayed, Ismailia, EG
002 064 3201521
002 064 3205402 (Fax)

Studies and Contracts

studies@elkholysteel.com

General Manager (Mr. Alaa El-Kholy)

alaa.elkholy@elkholysteel.com
002 0100 050 1188
002 0122 335 4069
Quick Message