Diving works Repairing of Broken Pipeline at Depth=25m
2019-02-01 To 2019-02-28

General Petroleum Company (GPC): (Offshore) Amer (2) platform

Project: Repairing of Broken 6" Pipeline at Depth=25m

  • Seabed survey by divers for riser, riser clamps to locate breaking point on pipeline and free span points all supported by video recording.
  • Carry out cold cutting works for the old riser and around the breaking point.
  • Carry out Diving works for Inspecting pipe thickness by (UT) before installation of the mechanical connector.
  • Supplying Mechanical Connector & Swivel flange and carry out diving works for installation of mechanical connector & Swivel flange on the pipeline.
  • Fabrication and carry out diving works for installation and fastening of new riser, clamps and spools.
  • Leak Test by pressurizing the line with
    • Corrosion inhibitor +Oxygen Scavenger+Biocide
  • Free span correction for pipeline.

Latest Projects

El-Kholy Contractors and Steel constructions

For Mechanical and Electrical works

Support

Head Office

~ 11, New street , El Sheikh Zayed, Ismailia, EG
002 064 3201521
002 064 3205402 (Fax)

Studies and Contracts

studies@elkholysteel.com

General Manager (Mr. Alaa El-Kholy)

alaa.elkholy@elkholysteel.com
002 0100 050 1188
002 0122 335 4069
Quick Message